Below is a list of completed projects:

Row:

Project Name:

Year:

Location:

1

First and second phase studies in downstream lands of Khoda-Afarin Main Canal and irrigation & drainage system of 74000 Ha land

1992-1996

East Azerbaijan Province

2

First and second phase studies of Khoda-Afarin sprinkler and local irrigation networks of 5000 Ha land.

2004-2013

East Azerbaijan Province

3

Planning, design and construction supervision of artificial recharge projects which located in northern slopes of Sahand and Daryan-Chai basin

1990-1995

East Azerbaijan Province

4

Planning and design of water conveyance system from Zola-Chai to Shabestar for recharging groundwater aquifers

1995-2000

East Azerbaijan Province

5

Social and public participation studies on Khoda-Afarin first irrigation unit

2002-2005

East Azerbaijan Province

6

Social and public participation studies on Khoda-Afarin lands which located 300m above sea level

2005-2013

East Azerbaijan Province

7

Design and construction supervision of Aras pumping station and its conveyance pipeline

2005-2013

East Azerbaijan Province

8

Planning, design, construction supervision, assisting in operation and maintenance, and monitoring of Khoda-Afarin pilot farm which located in the first irrigation unit

2009-2013

East Azerbaijan Province

9

Supervision over implementation of action plan alternatives resulted from Khoda-Afarin social studies and assessment of utilization system in 9 Gheshlaghs of the first irrigation unit

2007-2012

East Azerbaijan Province

10

Design and construction supervision of six Farms pumping station in Khoda-Afarin first irrigation unit

2007-2017

East Azerbaijan Province

11

First and second phase studies of Khoda-Afarin conveyance system and irrigation & drainage network of 74000 Ha land

2002-2006

Ardabil Province

12

First and second phase studies of Khoda-Afarin sprinkler and local irrigation networks of 6000 Ha land

2006-2014

Ardabil Province

13

Social and public participation studies on the second irrigation unit of Khoda-Afarin

2008-2011

Ardabil Province

14

First phase supplementary studies & second phase pumping station studies of Mile-Moghan Diversion Dam and conveyance system to Khoda-Afarin Main Canal

2012-2013

Ardabil Province

15

First phase supplementary studies, Social and public participation studies and surveillance of operation system of main and secondary irrigation and drainage network of the Khoda-Afarin 4th irrigation unit

2015-2018

Ardabil Province

16

Design, construction supervision, operation- maintenance assistance, & monitoring of Khoda-Afarin Pilot farm in the first irrigation unit

2010-2013

Ardabil Province

17

First and second phase studies & construction supervision of Moghan Main Canal pumping station and its conveyance pipeline

2006-2011

Ardabil Province

18

Construction supervision of farm Pumping Stations of first irrigation unit of Khoda-Afarin

2010-2013

Ardabil Province

19

Reviewing design studies of Khoda-Afarin main canal and its irrigation network according to integrated management studies of Moghan Water and Soil resources

2011-2015

Ardabil Province

20

Construction supervision of Ghori-Chai Siphon with the length of 600 meters and consists of 4 steel pipes each with diameter of 3000 mm

2006-2012

Ardabil Province

21

Second Phase studies of Naghadeh irrigation and drainage networks of 9000 Ha land

1986-1990

West Azerbaijan Province

22

First and second phase studies of Holasu pumping station

1990-1993

West Azerbaijan Province

23

First phase studies of water supply and land management of Marivan & Ghezelche-su plains (Garan dam and main irrigation & drainage networks of 9000 Hectares land) – In Cooperation with Pooyab consultants

1989-2001

Kurdistan Province

24

Field studies of subsurface drainage system of Marivan & Ghezelche-su plains

1990-1991

Kurdistan Province

25

Preliminary groundwater studies of Marivan and Ghezelche-su plains

2002-2004

Kurdistan Province

26

Second phase studies of Marivan & Ghezelche-su plains irrigation and drainage networks

2001-2012

Kurdistan Province

27

Locating water sources and measurement of pertinent parameters related to surface and groundwater resources in Marivan & Ghezelche-su study areas 

2003-2005

Kurdistan Province

28

xx Land and water potential evaluation and development studies in Marivan & Sarvabad districts

2004-2005

Kurdistan Province

29

Phase two studies of Marivan & Ghezelche-su plains irrigation and drainage networks

2008-2012

Kurdistan Province

30

Construction supervision of the siphon crossing the city of Marivan 

2008-2018

Kurdistan Province

31

First and second phase irrigation & drainage studies of 1000 Ha land of Aran area

1990-1995

Kermanshah Province

32

First and second phase irrigation & drainage studies of 1000 Ha land of Tappe Yazdan area

1995-2016

Hamedan Province

33

First and second phase studies of artificial recharge in Hamedan 4 plains groundwater (Bahar, Razan, Kaboodar-ahang and Ghahavand)

1990-1996

Hamedan Province

34

First and second phase studies of diversion dams on Gamasiab River (Nahavand & Tuviserkan area) and Khomeygan River (Khomeygan & Tekye area)

1990-1993

Hamedan Province

35

First phase studies of water conveyance in Cooperation with Ramab consultant to the tropical areas of western part of the country

2001-2006

Ilam Province

36

Flood hazard mapping studies of Karun River in Ahvaz

1995-1997

Khuzestan Province

37

Furnishing a technical guideline on flood studies in urban planning and submission of a check-list for reviewing the related reports 


Tehran Province

38

Engineering services for potential flood hazard mapping study and consideration of protective measures against floods in developed areas (a pilot project on Jaj-rud River, upstream of Latian dam) 

1994-1995

Tehran Province

39

Structural design of Semi-elliptical precast concrete canals 

1986-1988

Tehran Province

40

The first and second stages Studies of the irrigation and drainage network of Kolol land with an area of 5000 hectares 

1992-1999

Bushehr Province

41

Field studies for subsurface investigation (logging) and measurement of hydraulic conductivities and infiltration rates of soils in Kolol plain 

1993-1994

Bushehr Province

42

Second phase studies & construction supervision over Kolol subsurface drainage network

1999-2000

Bushehr Province

43

Second phase studies & construction supervision over Kolol main drainage canal

1995-1999

Bushehr Province

44

Second phase studies & construction supervision over the pumping station and its related conveyance pipeline for domestic water supply from Bushehr to the nuclear plant residential camp

1998-2001

Bushehr Province

45

Second phase studies & Designing of a 10000 cubic meter potable water reservoir for the residential camp of Bushehr nuclear plant

2001-2012

Bushehr Province

46

Studying and Design the incoming water purification system to the 10000 cubic meter reservoir for the residential camp of Bushehr nuclear plant

2002-2005

Bushehr Province

47

– Planning, design and construction supervision over groundwater artificial recharge projects in Borazjan, Khormuj and Abdan to east of Kangan areas

1990-2000

Bushehr Province

48

First and second phase studies & construction supervision over Tangab-Firooz-Abad diversion dam

1992-1995

Fars Province

49

Reconnaissance and feasibility studies of Lamerd & Harang surface water potentials

1986-1989

Fars Province

50

Complementary design (rehabilitation) and construction supervision over historical Tilkan diversion dam on Kor River

1987-1990

Fars Province

51

First and second phase studies on Kor River hydro potentials at the historical dam sites in Korbal area

1989-1997

Fars Province

52

Design and construction supervision over a large bridge on Kor River at Rahmat-Abad

1990-1993

Fars Province

53

First and second phase studies and construction supervision over Khafr diversion dam and its related groundwater artificial recharging system

1990-1997

Fars Province

54

Reviewing of design drawings and construction supervision over Fahlian diversion dam

1994-1996

Fars Province

55

Complementary design (rehabilitation) and construction supervision over historical Faiz-Abad diversion dam on Kor River

2000-2002

Fars Province

56

First and second phase studies of Faiz-Abad irrigation & drainage networks (water supplied through the historical Faiz-abad dam)

2000-2003

Fars Province

57

Design and construction supervision over Tange-khooni groundwater artificial recharging project in Khafr area

2002-2004

Fars Province

58

Irrigation & drainage field studies of Fahlian, Masiri & Dehno plains (subsurface investigation and logging, measurement of hydraulic conductivities and infiltration rates)

2004-2005

Fars Province

59

Research project for performance evaluation of Khafr diversion dam and its related recharge system

1999-2000

Fars Province

60

Construction supervision over grade 2 and 3 of irrigation and drainage network in downstream lands of Faiz-Abad ancient diversion dam

2009-2017

Fars Province

61

First and second phase irrigation & drainage studies of Fahlian, Masiri and Dehno plains

2004-2007

Fars Province

62

Construction supervision over irrigation projects to Farming lands in Fahlian, Masiri and Dehno plains

2005-2008

Fars Province

63

Rehabilitation study and Construction supervision on performing remedial measures at Fahlian diversion dam

2009-2013

Fars Province

64

First and second phase studies of Jannat-rudbar hydro-electric project near Ramsar

1987-1990

Mazandaran Province

65

Reconnaissance studies of Hydropower potential on uphill streams of Pole-Rud River in Eshkevar area

1989-1990

Mazandaran Province

66

First and second phase studies of water conveyance and storage systems of raw and potable water for Sangan Iron mines

1991-2001

Khorasan Razavi Province