Below is a list of under process projects:


Row:

Project Name:

Location:

1

Water transfer plan and Khoda-Afarin downstream dam Irrigation and Drainage network

East Azerbaijan Province


Plan geographical location:

The lands of Khoda-Afarin Project are located in the eastern Azerbaijan province on the upper terrace of Moghan plain and in the west of the darreh rud. Some Part of the plot area is also adjacent to the Aras River. The area of irrigation and drainage projects in this province is about 12000 hectares.
The extent of irrigation and drainage network of the Khoda-Afarin Dam in East Azerbaijan Province are limited to the west of the Qiz Qal ‘ehsi regulatory Dam and from the East to the border between the two provinces, East Azerbaijan and Ardebil, near the darreh rud. The northern boundary of the project extends to the Aras River and its southern border to the level of about 400 meters above sea level. The plan range is shown in the following map

Plan Targets:

Among the objectives of the plan for the development of agriculture can be the increase in the production of crops and gardens, as well as the development of industrial livestock and the lateral industries of agriculture and animal husbandry, and the economic and social effects of the plan are as follows.
600 billion Rials Increased annual revenues
Employment creation during the exploitation of 4,000 people per year
Employment creation during the execution of 800 people per year
Increasing production in agriculture by 57,000 tons per year
Increasing production in the garden sector by 66,000 tons per year
Organizing about 1600 Arasbaran tribal families
Increase household income
improving resident’s health care and treatment facilities
Prevent migration of district residents and even immigration from the center of the province and neighboring cities

3-Plan Details:

The Khoda-Afarin main channel was filled in elevation about 248 meters from the Qiz Qal’ ehsi lake Regulatory Dam and at the elevation range and with the minimum allowed slope parallel to the elevation lines.
The length of the main channel is about 142 km, 52 km in East Azerbaijan. The channel capacity is initially 72 cubic meters per second and at the entrance to Ardabil province is 60 cubic meters per second. The water transfer system consists of a trapezoidal channel, a rectangular channel, a covered channel, a siphon, a regulator, an intake, an overflow and a bridge.
A trapezoidal channel with a depth of 7.5 meters and 5 meters’ height, totaling 41 kilometers length, and a rectangular channel with 8 meters’ dimensions and a 6 meters’ height, totaling 8.6 kilometers length, and siphons totaling 2.4 kilometers length.
Each siphon consists of 5 strings of steel pipes (with the exception of Larijan siphon, which has 4 strings) each with 3000 mm diameter and total 7 siphons with 60 to 72 cubic meters per second capacity and 200 to 650 meters’ siphons length. This channel has the capacity to transfer water to irrigate more than 74,000 hectares of lands

4-projects:

1- Supervision of the operation of the Khoda-Afarin main channel in East Azerbaijan province, 52 km length [since 2004]
Executors:
Employer: Regional water company of East Azerbaijan province
Contractors: jonoub Sazeh, Sabir, Tonkawa, Pavan, Moshiran, Rahsara, Abyaran pahn dasht, Iran Spiral
2- Supervision of the operations of main and secondary the 2150 hectares’ irrigation and drainage network of Khoda-Afarin the first irrigation unit [since 2016]

Executors:

Employer: East Azerbaijan Agricultural Jihad Organization
Project Management: First Consulting Engineers
Contractors: Azarmahad Companies, Savalan Shokouh, Hazhir Abnieh, Dand, Rahsara

2

Water transfer plan and Khoda-Afarin downstream dam Irrigation and Drainage network

Ardabil Province

Plan geographical location:

The extent of Khoda-Afarin downstream dam Irrigation and Drainage network lands in Ardebil province from the east to the bolgar chay border river and from the west to the border between the two provinces of East Azerbaijan and Ardebil and from the north to the Moghan existing Channel or the Moghan Pump Area and extends from the south to a level of about 400 meters above sea level.

Plan Target:

• Increased annual revenue of 3200 billion Rials
• Increasing production in the agricultural sector by 700,000 tons per year
• Increased production in the garden sector of 45,000 tons per year
• Increased production in the animal husbandry sector, 8,000 tons of meat and 100,000 tons of milk
• Employment creation during the exploitation of 10,000 people per year
• Employment creation in during the execution of 2200 people per year
• Organizing about 10,000 Shahsevan tribal households
• improving resident’s utilities, health care and treatment facilities
• The conversion of rangeland to water fields
• Prevent migration of district residents and even immigration from the center of the province and neighboring cities

3- Project Components:

The Khoda-Afarin main channel was filled in elevation about 248 meters from the Qiz Qal’ ehsi lake Regulatory Dam and at the elevation range and with the minimum allowed slope parallel to the elevation lines. The length of the main channel is about 142 km, 52 km in East Azerbaijan and It continues at a length of 90 km in the Ardabil province. The water level in the main channel at the boundary between the two provinces is about 235 meters and at the end of the channel is 209 meters above sea level. The channel capacity at the entrance to Ardabil province is 60 m3 / s.
The main channel of Khoda-Afarin in Ardebil province consists of 82.2 km of trapezoidal and rectangular channel 800 m indoor and 7 km siphon. Each siphon consists of a series of parallel steel pipes with size between 2500 and 3000 mm and siphons length are between 300 and 2100 meters. The longest Siphon (darreh rud) consists of 5 steel pipes each with a diameter of 2800 mm and a length of 2100 meters. This channel has the capacity to transfer water to irrigate over 62,000 hectares of lands.

4- Projects:

Supervision of the operation of the main channel of Khoda-Afarin in Ardabil province, 92 km length [since 2004]
Executors:
Employer: Regional water company of Ardabil province
Contractors: jonoub Sazeh, padir sazeh, moein abshar, Nahrbandan, sekooh, Rahsara, Segal Azar, Hydroniro pars, Avantil, Altai, khamesh, Arman Nasr, Azerbaijan ‘s Arman Nasr and Tabriz Tik companies

2- Second phase studies of the main and secondary network of irrigation and drainage of the 4th irrigation units of Khoda-Afarin in Ardebil province [since 1394 till now]

Executors:

Employer: Regional water company of Ardabil province
Contractors: Tavan Ab Consulting Engineers Co.

3-Supervision of the operation of the irrigation and drainage network of the Khoda-Afarin 4th irrigation unit of with an area of 9700 hectares [since 1396 till now]

Executors:

Employer: Regional water company of Ardabil province
Contractors: Altai and Tabriz Tik Companies

3

شبکه آبياري و زهکشي دشتهاي مريوان و قزلچه سو

استان کردستان


1- موقعيت جغرافیائی طرح :

محدوده مورد مطالعه در غرب استان کردستان بين عرض هاي شمالي 25درجه و 35 دقيقه تا 35 درجه و 47 دقيقه و طول شرقي 46درجه و 0 دقيقه تا 46درجه و 29 دقيقه قرار دارد. اين محدوده در فاصله 150 کيلومتري از شهر سنندج واقع و در اطراف شهر مريوان و درياچه زريوار گسترده شده است. 


2- 

اهداف طرح :

  • ايجاد شبکه آبياري و زهکشي مدرن جهت نيل به اهداف زير مد  نظر بوده است :
  • بهبود و توسعه اراضي از سطح خالص 3500 هکتار به حدود 5170 هکتار ( زراعت و باغداري ) و دامداري صنعتي و صنايع جانبي
  • تأمين آب مطمئن براي اراضي منطقه طرح
  • افزايش بهره وري از منابع خاک و آب
  •  توسعه و بهبود توليدات کشاورزي و دامي
  • ايجاد اشتغال

3-  اجزاء طرح :

کانال انتقال بنام GMC به طول تقريبي 17 کيلومتر و با ظرفيت 7 مترمکعب در ثانيه از محل سد گاران آبگيري و پس از ورود آب به محدوده اراضي، به ميزان 2 مترمکعب در ثانيه تحويل ايستگاه پمپاژ سلسي شده و الباقي بصورت ثقلي وارد شبکه شده و توسط خطوط لوله و کانال  MPC-2 در سطح منطقه توزيع مي گردد. شبکه آبياري و زهکشي در 4 واحد عمراني با وسعت خالص 5170 هکتار طراحي شده است.


4- پروژه ها :

1-  نظارت بر تهیه ، حمل و نصب تجهیزات و احداث ایستگاه پمپاژ سلسی و مخزن ذخیره [ از سال 1392 تاکنون ]

عوامل اجرایی : کارفرما : شرکت آب منطقه ای استان کردستان

پیمانکاران : شرکت های چم گستر و اندیشه پویان

 

2- نظارت بر احداث سامانه انتقال و مخازن حدفاصل ایستگاه های پمپاژ سلسی و سلسی علیا [ از سال 1392 تاکنون ]

عوامل اجرایی : کارفرما : شرکت آب منطقه ای استان کردستان

پیمانکاران : شرکت های چم گستر


3- نظارت بر احداث ایستگاه پمپاژ سلسی علیا و شبکه اصلی آبیاری [ از سال 1392 تاکنون ]

عوامل اجرایی : کارفرما : شرکت آب منطقه ای استان کردستان

پیمانکاران : شرکت های جهاد نصر کردستان


4-  نظارت بر احداث سامانه انتقال آب و احداث مخازن و ایستگاه های پمپاژ واحد عمرانی سوم پایاب سد گاران [ از سال 1396 تاکنون ]

عوامل اجرایی : کارفرما : شرکت آب منطقه ای استان کردستان

پیمانکاران : شرکت شایگان مهر اپادانا


5- نظارت بر تامین تجهیزات و اجرای پست 20/63 کیلوولت ایستگاه پمپاژ سلسی و خطوط 63 و 20 کیلوولت

عوامل اجرایی : کارفرما : شرکت آب منطقه ای استان کردستان

پیمانکاران : شرکت تدبیر انرژی سپنتا